Disruptions

The effect of the Order will be to temporarily close the following section of footpath:-

Footpath 41 Llantrisant

That part of the footpath that commences at its junction with Footpath 40 Llantrisant, 80 metres south west of Cwm Gwyrdd Medical Centre, High Street, Gilfach Goch and 25 metres east of the Ogwr Fach river at Grid Reference SS97838897 and proceeds in a general easterly direction for 80 metres to terminate 50 metres south of Cwm Gwyrdd Medical Centre at Grid Reference SS97908898

The restriction is necessary in the interests of public safety during the building of a new housing development near the footpath During the closure the alternative route is via the existing highway network

The Order will be in operation from 29th April 2019 for 6 months or until such time as the works have been completed

Back